Representative Conversion Projects

Dan-Swift1-300x163.jpg
  • Prepared full construction design for extensive molasses handling and storage system on a bulk carrier (2014-2015)
  • Developed full fabrication, installation and Class approval drawings for a retrofit of a ballast water treatment system on series of car carriers (2013-2015)
  • Performed plan review and structural assessment for tanker conversion to oil well response vessel (2011)
  • Participated in bid design and detailed design of several single hull tanker to FPSO conversions (2009-present)
C9-Garage-DHead-20x30-300x200.jpg
  • Participated on detailed design team for major conversion of a RoRo vessel to an Offshore Accommodations and Services Vessel (m/v Dan Swift) at Blohm+Voss (2007-2009)
  • Designed modification on post panamax containership to increase 53’ container stowage
  • Prepared detailed design for 1300 Auto Garage Conversion for Containership (2006)
  • Performed engineering related to US Flag Conversion for m/v National Glory including GAP analysis for rule compliance (2005)
  • Developed detailed design for RoRo vessel conversion to combination RoRo/Container Carrier with stacked containers on deck (2005)
  • Developed designs for single hull tanker conversion to bulk carrier and for addition of double hull (2006-2008)
  • Prepared detailed design for addition of a 750 auto garage to a containership (2003)